Joined Forbes in 1999 following 7 years experience with another major GRP chemical plant fabricator as design and production engineer. Promoted to the Board of Directors in September 2008.
Two-Stage Scrubbing System Installation
Forbes have recently completed the design, build, installation and commissioning of a two-stage scrubbing system to reduce emissions from industrial waste processing.